Supervision for upgrading Km 0 - -Km 27 and Km 27 – Km 54 section of Vaziani-Gombori-Telavi Road.
IDC Ltd acted as a “Local Associate” of MMM Group limited (“Lead Consultant”). Works were conducted in accordance of FIDIC guidelines and included supervision of: road rehabilitation, arrangement of bridges, gabions, retaining walls, water drainage and reinforced concrete channels.
Topographical and geotechnical surveys were performed. Reinforced concrete foundations for STP units (RBC Unit, Twin Effluent Pump Station, UV Chamber and Mag Flow meter), concrete surroundings and pipelines from STP facilities to r. Supsa were designed in accordance with provided dimensions. Layout schemes for STP facilities were determined.