In Bakuriani region, pouring of reinforced concrete on the parapets of Secondary Containment Structures arranged on the rivers: Tskhratskaro, Kumiska-1, Kumiska-2, Oshora-1 and Oshora-2 and in the foundations of three generators (356m³). Construction of storage places for three generators; provision of facing works in them.
Arrangement of 7343m³ gabions at the banks of the aforementioned rivers.
For installation of four wind turbines at BV16 and GB03 following works were done - topographical survey and geotechnical investigations of sites, calculation of bearing capacities of turbine foundations, rehabilitation of access roads, preparation of construction sites, installation of foundations of turbines and winch anchors with reinforced concrete, installation of cable ducts.
Works included arrangement of monuments alongside the pipelines and their planning in absolute coordinates. In total 203 monuments have been arranged.
Topographical and geotechnical surveys have been conducted; there have been designed reinforced concrete foundations for STP facilities and concrete surroundings, reinforced concrete intake and discharge manholes in the reed-bed according to the given dimensions, also pipelines from STP facilities to the reed-bed and from the reed-bed to the existing ravine. Layout schemes for STP facilities have been determined. Construction process included installation of necessary STP equipment (RBC Unit, Twin Effluent Pump Station, UV Chamber and Mag Flow meter) on the pre-arranged reinforced concrete foundation and placement of these equipment in the concrete slabs. Also, construction of reed-bed.
Beds of all three rivers and their banks were fortified by means of 0, 7-1,0m size riprap. In total, 1400mі of riprap have been arranged on all three rivers.
Area topographical survey and geotechnical investigation. Permanent Accommodation Area consist of the following facilities: bedroom facility for 24 persons, kitchen/dining facility, guard house, generator enclosure and fuel storage shed, sewage treatment plant, smoking shelter, waste segregation area, outdoor recreation area, parking area, court. The work included the following designs: area vertical planning architectural, structural, indoor electrical system; outdoor security lighting, water supply, sewer system, heating, ventilation, security CCTV system, fire alarm system etc. For the design were applied local standards as well as British Standards, IBC-2000, NFPA 101.
Geotechnical survey included study of location places of administration buildings in the four districts of Tbilisi. Drilling works and laboratory analysis have been conducted resting on them geotechnical conclusions, for all four building locations, have been issued.
In order to enhance the integrity of the Western Route Export Pipeline crossing, emergency repair was carried out. Up to 3 000 cub.m. Riprap was placed alongside Liakhvi river crossing with the pipeline. As built documentation preparation.
Topographic Survey of WREP Satskhenisi river crossing corridor (width 20m) and determining pipeline depth. Desktop processing of the filed data.
Drilling of 4 boreholes (19m of total length) within Tbilisi Tuberculosis Center, soil laboratory testing, drafting geotechnical report.