    In Bakuriani region, pouring of reinforced concrete on the parapets of Secondary Containment Structures arranged on the rivers: Tskhratskaro, Kumiska-1, Kumiska-2, Oshora-1 and Oshora-2 and in the foundations of three generators (356m³). Construction of storage places for three generators; provision of facing works in them.
    Arrangement of 7343m³ gabions at the banks of the aforementioned rivers.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start ივლისი 2009
    • Completion იანვარი 2010
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:26

    Arrangement of foundations for wind turbines and cable ducts at BV16 and GB03

    For installation of four wind turbines at BV16 and GB03 following works were done - topographical survey and geotechnical investigations of sites, calculation of bearing capacities of turbine foundations, rehabilitation of access roads, preparation of construction sites, installation of foundations of turbines and winch anchors with reinforced concrete, installation of cable ducts.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Design, Construction, Survey
    • Start ივლისი 2009
    • Completion ოქტომბერი 2009
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:24

    Arrangement of monuments alongside the BTC and SCP Pipelines

    Works included arrangement of monuments alongside the pipelines and their planning in absolute coordinates. In total 203 monuments have been arranged.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Survey
    • Start ივლისი 2009
    • Completion ოქტომბერი 2009
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:22

    Designing and construction of STP facilities in Tetritskaro (PSG2) and Tsalka (OSRB).

    Topographical and geotechnical surveys have been conducted; there have been designed reinforced concrete foundations for STP facilities and concrete surroundings, reinforced concrete intake and discharge manholes in the reed-bed according to the given dimensions, also pipelines from STP facilities to the reed-bed and from the reed-bed to the existing ravine. Layout schemes for STP facilities have been determined. Construction process included installation of necessary STP equipment (RBC Unit, Twin Effluent Pump Station, UV Chamber and Mag Flow meter) on the pre-arranged reinforced concrete foundation and placement of these equipment in the concrete slabs. Also, construction of reed-bed.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Detail design, Construction, Survey
    • Start მარტი 2009
    • Completion დეკემბერი 2009
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:21

    Fortification of river Supsa, Tkhilnara and Kvintskali crossings of the WREP Pipeline

    Beds of all three rivers and their banks were fortified by means of 0, 7-1,0m size riprap. In total, 1400mі of riprap have been arranged on all three rivers.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start მარტი 2009
    • Completion ივნისი 2009
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:19

    Area 80 Permanent Accommodation Design

    Area topographical survey and geotechnical investigation. Permanent Accommodation Area consist of the following facilities: bedroom facility for 24 persons, kitchen/dining facility, guard house, generator enclosure and fuel storage shed, sewage treatment plant, smoking shelter, waste segregation area, outdoor recreation area, parking area, court. The work included the following designs: area vertical planning architectural, structural, indoor electrical system; outdoor security lighting, water supply, sewer system, heating, ventilation, security CCTV system, fire alarm system etc. For the design were applied local standards as well as British Standards, IBC-2000, NFPA 101.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Detail design
    • Start მარტი 2009
    • Completion ოქტომბერი 2009
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:17

    Geotechnical surveys for four administration buildings of Tbilisi city

    Geotechnical survey included study of location places of administration buildings in the four districts of Tbilisi. Drilling works and laboratory analysis have been conducted resting on them geotechnical conclusions, for all four building locations, have been issued.

    Additional Info

    • Client Name Tbilisi City Council
    • Work Type Geotechnical Survey
    • Start თებერვალი 2009
    • Completion ივნისი 2009
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:15

    Rectification Work at WREP Liakhvi River Crossing

    In order to enhance the integrity of the Western Route Export Pipeline crossing, emergency repair was carried out. Up to 3 000 cub.m. Riprap was placed alongside Liakhvi river crossing with the pipeline. As built documentation preparation.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start იანვარი 2009
    • Completion თებერვალი 2009
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:13

    R. Satskhenisi WREP Crossing Topographical Survey

    Topographic Survey of WREP Satskhenisi river crossing corridor (width 20m) and determining pipeline depth. Desktop processing of the filed data.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Topographical Survey
    • Start იანვარი 2009
    • Completion თებერვალი 2009
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:09

    Geotechnical Survey on the Territory of Tbilisi Tuberculosis Center

    Drilling of 4 boreholes (19m of total length) within Tbilisi Tuberculosis Center, soil laboratory testing, drafting geotechnical report.

    Additional Info

    • Client Name Caucasus Consulting Group
    • Work Type Geotechnical Survey
    • Start იანვარი 2009
    • Completion იანვარი 2009
    • Location Georgia