მოძებნე პროექტი

    ძებნის პარამეტრები

    • საძიებო სიტყვა
    • წელი
    • კლიენტი
    სამშაბათი, 31 ოქტომბერი 2017 14:47

    Design Works Rail Crossing Access to PSG2

    Topographic survey at rail crossing 1n1:500 scale both railroad and vehicle road sections inclusive. Vehicle roads CBR testing. Design of Railroad crossing features and vehicle road cover design. Report Development.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start თებერვალი 2007
    • Completion მაისი 2007
    • Location Georgia
    Published in Projects
    სამშაბათი, 31 ოქტომბერი 2017 14:44

    Structural Integrity Assessment of buildings, located in Georgia

    Assessment of buildings bearing structures, determination of existing damages (if any). Recommendations issue about antennas installation on the buildings taking into account their structural integrity.

    Additional Info

    • Client Name Communications New Technologies
    • Work Type Survey
    • Start თებერვალი 2007
    • Completion მარტი 2008
    • Location Georgia
    Published in Projects
    სამშაბათი, 31 ოქტომბერი 2017 14:39

    Minor Works on Call-Off Basis

    Recovering works and maintenance at BV12; Refuelling at GB 21; Rock salt delivery from Rustavi pipe yard to PSG: Fabrication of fuel container and its transportation to Rustavi pipe yard; Provision of Water Tanker for PSG 1.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Maintenance, Procurement/Fabrication
    • Start თებერვალი 2007
    • Completion მარტი 2007
    • Location Georgia
    Published in Projects
    სამშაბათი, 31 ოქტომბერი 2017 14:36

    Provision of Secondary Containment Structure Redesign

    Redesign of bank revetments and river-bed landscape due to environmental fitness. Redesign of Reinforced Concrete Sluice Gates Structures. Earth, gabion walls, riprap, road covers, r/c structures etc. work scopes development.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Detail design
    • Start თებერვალი 2007
    • Completion მარტი 2007
    • Location Georgia
    Published in Projects
    სამშაბათი, 31 ოქტომბერი 2017 14:33

    Helipad Area Rehabilitation in Akhaltsikhe

    Removal 50cm cover (concrete and crushed rock) from the helipad area and 5sm thickness gravel cover from the adjacent road. Debris removal on Akhaltsikhe landfill. Area spreading by bulldozer and grader.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start თებერვალი 2007
    • Completion თებერვალი 2007
    • Location Georgia
    Published in Projects
    სამშაბათი, 31 ოქტომბერი 2017 14:30

    Erosion Measures and Bridge Crossing over r. Satskhenisi Design

    Visual inspection of 28 erosive sites along Baku-Supsa oil pipeline, in case of need, detail topographic and geotechnical survey, design of erosion measures (arranging dams, berms, drainage channels, retaining walls etc). Carrying out detail topographical and geotechnical investigations, bridge design over r. Satskhenisi.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start ნოემბერი 2006
    • Completion დეკემბერი 2007
    • Location Georgia
    Published in Projects
    სამშაბათი, 31 ოქტომბერი 2017 13:56

    Call-Off agreement for services for Kodiana Projects

    Provision of different professionals (civil engineers, surveyors, geologists, hydrologists etc) for Kodiana Projects on the basis of call-off agreement.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start ივნისი 2006
    • Completion დეკემბერი 2007
    • Location Georgia
    Published in Projects
    გვერდი 3 სულ 3
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    ძებნა