    Provision of River Crossing Surveys

    Hydrological survey, river cross-section surveys and river sediment sampling of the six rivers in Akhaltsikhe area.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Field Survey, Data Development
    • Start აგვისტო 2003
    • Completion სექტემბერი 2003
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 12:51

    Provision of Stream Cross-Section and Topographic Survey “Scope-2”

    Topographic survey, cross-section survey, sediment sampling and grain size analysis, determination of maximum flow rates, processing of field data and preparation of deliverables for rivers Ktsia, Algeti and Gumbati and five stream crossings with BTC in Borjomi-Bakuriani region.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Field Survey, Data Development
    • Start ივნისი 2003
    • Completion ივლისი 2003
    • Location Georgia
    Published in Projects

    Design of rehabilitation measures for Bakuriani-Tetritskaro Pass, Bakuriani-Tsikhisjvari, Dviri-Sakire and Borjomi-Bakuriani segments and geotechnical field works, visual geotechnical assessment during this period; development of road cover structures, road plans, long and cross-section profiles; re-design of small radius and narrow section of roads, bridge and pipe rehabilitation works, retaining walls in landslide area and galley places etc.

    Additional Info

    • Client Name Spiecapag/Petrofac JV
    • Work Type Field Survey, Design
    • Start ივნისი 2003
    • Completion ივლისი 2003
    • Location Georgia
    Published in Projects
    პარასკევი, 28 ივლისი 2017 20:32

    Survey Works as Part of the Baku-Tbilisi-Ceyhan (BTC) Geohazards Investigation

    Line and point surveys using total station equipment at the Minadze, Tiseli, Sakire and Kodiana sites in Bakuriani District

    Additional Info

    • Client Name URS D&M
    • Work Type Field Survey
    • Start მაისი 2003
    • Completion ივნისი 2003
    • Location Georgia
    Published in Projects
    პარასკევი, 28 ივლისი 2017 19:08

    WREP Rustavi Fault Crossing Engineering Measures Development (KP479)

    Design works in order to improve pipeline operable conditions at KP479,7 from Baku tectonic fault crossing of Georgian Section of WREP.

    Design works: F5,3 ha field topographic survey, geotechnical and laboratory works, pipeline burial depth determination, desktop processing, development of the design to provide re-grading of soil cover on the 200m section of the pipeline also to enable effective drainage of rainwater by rip-rap channels; determination of relevant ground works scopes; reduce soil cover to 0.9m over the pipeline in order to improve pipe working under seismic loads

    Additional Info

    • Client Name Georgian Pipeline Company
    • Work Type Detail design, Field Survey
    • Start მარტი 2003
    • Completion მარტი 2003
    • Location Georgia
    Published in Projects
    პარასკევი, 28 ივლისი 2017 18:13

    Design of Soil Cover Increasing on Old Sections of WREP (KP44 – KP50)

    Topographic survey works and office data processing, determination of several alternative options for ground work scopes needed to increase ground layer thickness above pipe (by 60, 70 or 80 cm); development of proposed work scopes list and design of culvert to ensure normal operable conditions of the earth road at KP46+179.

    Additional Info

    • Client Name Georgian Pipeline Company
    • Work Type Detail design, Field Survey
    • Start მარტი 2003
    • Completion მარტი 2003
    • Location Georgia
    Published in Projects