მოძებნე პროექტი

    ძებნის პარამეტრები

    • საძიებო სიტყვა
    • წელი
    • კლიენტი

    Construction of Underground Collector for Pipelines Laid from Wagon Bay to Oil Base

    Specifying location of underground utilities (cables, water and sewage pipelines, gas pipeline, various optical cables etc.); Topographical and geotechnical filed works; Laboratory analyses of soils; Providing detail design drawings and report; Agreement of design documentation with railway department and Obtainment of other construction permits.

    Construction works included demolition of reinforced concrete tunnel and manholes and construction of new one; Dismounting old oil pipes and arrangement of new pipes; Preparation of as-built drawings.

    Additional Info

    • Client Name: Sun Petroleum Georgia LLC
    • Work Type: Design, Construction
    • Start: ივნისი 2020
    • Completion: აგვისტო 2021
    • Location: Georgia
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    ძებნა