Print this page

Provision of Concrete Valve Pit for 4” valve on PSG2 SCP

Construct and install the vault from prefabricated reinforcement concrete structures for the 4” SCP valve outside of PSG2.

Project Details

  • Client Name: BP/BTC Co
  • Work Type: Construction
  • Start: September 2008
  • Completion: November 2008
  • Location: Georgia