Print this page

Reinforced Slab Detail Design/Construction and Access Road Arrangement at PSG 1

Reinforced concrete foundation was designed and constructed at PSG-1 CWAA area. C35 concrete was used for the foundation. 50m long access road to the r/c foundation was arranged.

Project Details

  • Client Name: BP/BTC Co
  • Work Type: Detail design, Construction
  • Start: March 2008
  • Completion: May 2008
  • Location: Georgia