Georgian Gas Transmission Pipeline Rehabilitation TC – Technical and Environmental Survey

Detailed technical specific surveys on the various sections of the Georgian Gas Transmission Pipeline which includes: geotechnical Inspection; pipeline corrosion, coating inspection; valves and gas distribution stations technical condition inspection; civil engineering inspection works; environmental baseline, audit and analysis.
These studies will be carried out on 74% (a total of 222km) of the pipeline length covering the following sections:
Section A – Kazbegi-Pasanauri
Section B – Pasanauri-Saguramo
Section C - Saguramo-Norio
Section D – Norio-Tsiteli Khidi

Project Details

  • Client Name: EBRD
  • Work Type: Survey, Investigation
  • Start: July 2006
  • Completion: November 2006
  • Location: Georgia