Redesign Six Secondary Oil Containment Structures and Tori Access Road Design

Architectural design of structure surfaces. Design of generators or heavy capacity batteries storage area in structures’ lower bay. Design of bank revetments and river-bed landscape due to environmental fitness. Hydrological recalculation of cross hydraulic structures in case of lack of orifices.
Topographic and geotechnical survey of 9km long Tori access road, hydrological surveys, design of gravel road structure and artificial structures (design of three small bridges and 32 culverts).

Project Details

  • Client Name: BP/BTC Co
  • Work Type: Detail design
  • Start: October 2005
  • Completion: November 2005
  • Location: Georgia