Print this page

Heritage Road repair at CSG2

Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance, procurement. Carry out construction works such as – Excavation of damaged road section for installation flume pipes, Installation of flume pipes, arrangement concrete headwalls, arrangement protection walls with gabions, installation of reno-mattresses in the river bed, widening the river bed, arrangement road surface with rip-rap.

Project Details

  • Client Name: South Caucasus Pipeline
  • Work Type: Construction
  • Start: June 2019
  • Completion: July 2019
  • Location: Georgia