Print this page

MX77 Access Road Construction

Project planning and scheduling, procurement of materials, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance, carry out of construction activities, such as stripping and stockpiling the topsoil, construction of levelling layer and road structure using sand/gravel and crushed rock, installation of 500 mm diameter culverts using corrugated plastic pipes, arrangement of ditches, installation of concrete slabs at the pipeline crossings. Road length is 2 050 m.

Project Details

  • Client Name: Saipem Contracting Netherlands BV Georgia Branch
  • Work Type: Construction
  • Start: July 2016
  • Completion: October 2016
  • Location: Georgia