Print this page

Engineering and Quantity Surveying Works for BTC Pipeline 9 River Crossings

Determination of pipeline position on longitudinal sections, visual evaluation of soil, determination of cross-section configuration issuing relevant recommendations, determination of excavation work scopes.

Project Details

  • Client Name: Spiecapag/Petrofac JV
  • Work Type: Feasibility Study
  • Start: November 2003
  • Completion: December 2003
  • Location: Georgia