Print this page

Designing of measures for protection of BTC/SCP and WREP Pipelines from washout at the river Shamkirchai, Azerbaijan

Temporary measures, for protection of Pipelines from washout, have been designed at the river Shamkirchai and permanent measures are in the stage of designing. Designing includes arrangement of concrete and riprap barrages, arrangement of river bed revetment structures by means of riprap.

Project Details

  • Client Name: BP Exploration (Caspian Sea) Ltd. - Georgia
  • Work Type: Detail design
  • Start: October 2009
  • Completion: March 2010
  • Location: Azerbaijan