Provision of Back-up Civil Services

Conducted works comprise the following:
- Arrangement of Wind Turbine Foundations and Cable Ducts at Block Valves 03 and 16 of BTC Pipeline.
- Fence Repair Works at Block Valves 15 and 16 of BTC Pipeline.
- Arrangement of Reinforced Concrete Trackways for Turbine Removal at PSG 1 and PSG 2.
Works include detailed design as well as construction.

Project Details

  • Client Name: BP/BTC Co
  • Work Type: Detail design, Construction
  • Start: September 2009
  • Completion: January 2010
  • Location: Georgia