Print this page

Arrangement of foundations for wind turbines and cable ducts at BV16 and GB03

For installation of four wind turbines at BV16 and GB03 following works were done - topographical survey and geotechnical investigations of sites, calculation of bearing capacities of turbine foundations, rehabilitation of access roads, preparation of construction sites, installation of foundations of turbines and winch anchors with reinforced concrete, installation of cable ducts.

Project Details

  • Client Name: BP/BTC Co
  • Work Type: Design, Construction, Survey
  • Start: July 2009
  • Completion: October 2009
  • Location: Georgia