Print this page

Rectification Work at WREP Liakhvi River Crossing

In order to enhance the integrity of the Western Route Export Pipeline crossing, emergency repair was carried out. Up to 3 000 cub.m. Riprap was placed alongside Liakhvi river crossing with the pipeline. As built documentation preparation.

Project Details

  • Client Name: BP/BTC Co
  • Work Type: Construction
  • Start: January 2009
  • Completion: February 2009
  • Location: Georgia