Print this page

Geotechnical investigation and civil design for installation of STP at Supsa Terminal

Topographical and geotechnical surveys were performed. Reinforced concrete foundations for STP units (RBC Unit, Twin Effluent Pump Station, UV Chamber and Mag Flow meter), concrete surroundings and pipelines from STP facilities to r. Supsa were designed in accordance with provided dimensions. Layout schemes for STP facilities were determined.

Additional Info

  • Client Name: BP/BTC Co
  • Work Type: Design, Survey
  • Start: იანვარი 2010
  • Completion: იანვარი 2010
  • Location: Georgia